Sink, tap, waste and appliance pipework for kitchens in Greater London is handled by Proper Plumbing London. Weekday plumbing costs £110 an hour (minimum one hour), materials are extra and quotes are free.

The pipework under the units joins a cold drinking supply, hot water and a shared waste route into a space that cabinets will largely conceal. The aim is a layout where every valve can be reached and every trap can be opened.
What the survey covers
- Which cold pipe is fed directly from the mains for drinking
- Hot supply source and pressure
- Waste outlet position: stack, gully or pumped
- Distance and fall from the new sink position
- Service void behind the units and the route past drawers and corners
Moving the sink
A sink can move further for water than for waste. A long branch loses height along its run, and the outlet must still sit above the connection with an adequate fall. Where gravity will not work, a pump is an option with maintenance and power needs of its own; read pumped waste for kitchens. Island sinks need the floor construction checked before they are promised. When a fall to the stack cannot be achieved, there is pumped waste installation.
Typical sequence
- Isolate and remove old connections, capping anything left unused so no stagnant dead end remains.
- Run supplies and waste to heights that clear drawers, ovens and shelves.
- Fit a service valve for the tap and each appliance.
- After units are fixed, cut and seal penetrations.
- Fit sink, tap, trap and appliance hoses once the worktop is in place.
- Reconnect and test before kickboards go on.
Cut-outs in laminate or timber worktops need sealing so water cannot swell the edge. The sink needs its clips and seal fitted evenly.
Options that change the pipework
| Addition | Plumbing consideration |
|---|---|
| Boiling water tap | Space for tank and filter, power, maker's pressure range |
| Filter tap | Cartridge access |
| Waste disposal unit | Power, trap arrangement, suitable drain |
| Water softener | Unsoftened drinking tap, drain and overflow, bypass |
Some equipment, such as a reverse osmosis unit, requires notice to the water supplier.
Testing
Fill both bowls and release together. Check traps, overflow and hose joints during the discharge. Run each appliance through filling and pump-out while watching the space beneath. Leave a dry sheet of paper under the pipework for the first day to reveal slow drips.
Faults found during replacement
Old kitchens often reveal valves that no longer close, corroded pipe behind the units, a waste branch with little fall or an appliance hose joined with tape. These are best raised as soon as the old units come out, while access is open. Agree which items will be renewed, and photograph final pipe positions so that later fixings for shelves and rails can avoid them. A new waste route should be run with water before the plinth closes off the lowest joints.
Billing for this work
| Time | Rate |
|---|---|
| Weekday, 1 hour minimum | £110 per hour |
| Evening or weekend | from £140 per hour |
24/7 emergency visits: £110 an hour plus a £60 call-out on weekdays in the daytime, from £140 an hour plus £60 in the evening or at weekends. Booked jobs carry no call-out fee. Materials are extra and agreed first. VAT is not added. Quotation free. Rates verified 28 November 2026: billing detail.
What to send
Put the appliance list on the contact form. Email the kitchen drawing and photographs of the current pipework.
Related reading
Awkward kitchen layouts raise draining a basement kitchen, hiding pipes behind units and a dry kitchen cold tap. For outlets that run weakly or not at all, see where the water is not arriving.
At a glance
- Service
- Kitchen plumbing
- Area
- All of Greater London (service-area business, no showroom)
- Quote
- Free. Get the price in writing before work starts
- Phone
- 020 3961 8088
Questions
Can the sink move to an island?
Possibly. The water supply is usually easier to extend than the waste, which needs a workable fall or a pump, so the floor construction and outlet position are checked first.
Which cold pipe should feed the kitchen tap?
The survey identifies the cold pipe fed directly from the mains, which is the one used for drinking water.
When should old valves and pipes be raised during a refit?
As soon as the old units come out, while access is open and before new cabinets cover them.




























