Waste pipes

An air admittance valve lets air into drainage pipework when flow creates suction, then closes to keep drain air in. It can ventilate a long branch or finish a stack inside the building. It has to be chosen for the pipe and flow, fitted upright at a suitable height, and left where it gets air and can be reached.

An air admittance valve on a soil pipe inside vented boxing

When it is needed

  • A new or lengthened branch exceeds the unventilated limits
  • A stack is to stop inside the building without passing through the roof
  • A trap is being siphoned and diagnosis points to lack of air
  • An existing valve has stuck, split or started to smell

Rules that shape the job

Approved Document H says ventilated discharge stacks may end inside a building when fitted with valves complying with BS EN 12380. It adds that:

  • the valve should not reduce the ventilation the below-ground drains need from open stacks
  • it should sit in an area with adequate ventilation, be accessible for maintenance and be removable to clear blockages
  • valves should not be used outside buildings or in dusty atmospheres
  • where there is no open vent on the system or connected drains, another way of relieving positive pressure should be considered

McAlpine's guidance for its valves also recommends installing them inside the building, requires them to be vertical, and asks for adequate ventilation and access. The instructions for the chosen model set the height above the highest connection.

What gets looked at

  • The symptom and whether a blockage or bad fall explains it instead
  • Whether the building's drains have at least one open vent
  • Pipe diameter and which appliances are connected
  • Highest point at which water enters, which affects valve height
  • An indoor location with air supply, access and reasonable protection from freezing

Options

Option Use Trade-off
Small valve on a branch or trap One appliance or short group Needs a reachable spot above the connection
Large valve on a stack top Internal termination Loft or duct needs ventilation and access
Open vent to outside Where positive pressure also needs relief Roof or wall penetration and siting rules
Re-pipe within unventilated limits Run can be shortened or enlarged No valve to maintain, but more pipework

An open ventilating pipe should finish at least 900 mm above any opening into the building within 3 m, according to the same document.

Inside boxing

A sealed duct starves the valve of air and hides it. Fit a ventilated, removable panel, as covered in boxing in pipes.

What changes the price

  • Diameter and valve class
  • Whether pipework must be extended upward to reach the right height
  • Access in lofts and ducts, and adding a panel or grille
  • Working on cast iron or other older material
  • Extra investigation if the real fault is in the drain

Ask for a quote

Email photos of the pipe or stack, its diameter, the fixtures connected, where an open vent exists if you know, and what you hear or smell. The contact form takes text only, so describe the job there and email the pictures.

Background on venting is in how these valves work.

At a glance

Service
Air admittance valve installation
Area
All of Greater London (service-area business, no showroom)
Quote
Free. Get the price in writing before work starts

Questions

Can an air admittance valve go in a loft or behind boxing?

Yes, if it stays upright, has adequate ventilation, can be reached and removed, and sits at the height its maker requires. A sealed box is unsuitable. Check the maker's conditions for unheated spaces.

Does fitting one need building control?

It depends on the work. Part H covers sanitary pipework, so a new branch, bathroom or altered stack may fall within it. Ask your building control body before closing anything up.

Can it go outside?

Approved Document H says valves should not be used outside buildings. Some manufacturers certify particular models for it, so agree that departure with building control first.

Fall towards stackTrap and sealVent to airSoil stack
Schematic, not to scaleWater seal in the trap, a steady fall on the branch, and a route for air at the stack.

Get a Free Quote

Your details are used to answer this enquiry and go to a partner plumbing business’s shared inbox and notification service. See everyone who receives them. Smell gas? Do not wait for a reply: leave and call 0800 111 999.

What happens next

  1. Your enquiry is passed onIt goes to a partner plumbing business.
  2. You get a replyThe plumber who may take the job uses the contact details you gave.
  3. Free quote, then you decideAgree the price and what it covers in writing before work starts.
  • Greater London coverage as a mobile, service-area business; there are no premises for callers.
  • Gas stays with Gas Safe registered engineers. Verify the card presented against the Gas Safe Register.
  • Pressurised, unvented cylinders: G3 qualified engineers only.

Prefer email? info@properplumbinglondon.co.uk

Prefer to talk? 020 3961 8088

keep reading

Related Pages

before you send it

Four Things Worth Having Ready

  • A wide photo and a close one

    One showing the room or cupboard, one showing the fitting or damage.

  • Your stop tap

    Where it is, and whether it turns with normal hand pressure. Do not force it.

  • What changed

    When it started, recent work nearby and anything already tried.

  • Access

    Who lets the visitor in, and whether a landlord or managing agent must agree first.

how it works

From Message to Finished Job

  1. Describe it

    Send the form, then email photos or a recording with your name.

  2. Settle the scope

    Quotes are free. Get the price and what it covers in writing before work starts.

  3. Check the finish

    Run the water, look at every joint touched and confirm who makes good.

also covered

Other Services

Ready to Describe the Job?

A few lines and a photo are a good start

Get a free quote