Pipework and valves
Replumbing means replacing some or all of a home's water supply and waste pipework, usually with new valves, supports and connections to fittings. Start by deciding what is actually failing. A survey may show that one concealed run and several valves need renewing while much of the rest can stay.
When it is worth considering
- Repeated leaks from different parts of the system
- Corroded, damaged or heavily altered pipework
- Layouts that cannot supply the rooms you plan
- Floors and walls already open for renovation
- No usable valves for isolating or draining sections
What the survey covers
- Which outlets are fed directly and which from storage
- Incoming pipe, pressure and flow, using measured figures
- Pipe materials and sizes, hidden runs and redundant branches
- Waste routes, falls and venting
- Floor construction, joist direction and likely asbestos locations
- Interfaces with hot water equipment, which may need a separately qualified person
Material options
| Option | Strengths | Trade-offs |
|---|---|---|
| Copper with capillary or compression joints | Rigid, neat when visible | Slower; soldering needs heat |
| Plastic push-fit | Flexible, long runs with fewer joints | Needs support sleeves, protection from sunlight and rodents, care near heat sources |
| Mixed | Copper where seen, plastic where routed | Correct transitions are essential |
Replacing metal pipe with plastic can break an electrical earth path or change what requires bonding. The IET explains that bonding depends on whether metalwork can introduce an earth potential. Have an electrician check it.
Rules the new work has to meet
Schedule 2 of the Water Fittings Regulations requires fittings to be watertight, supported and protected against freezing, with no joints concealed in a way that prevents access, enough stop and servicing valves, and drain taps. A system must withstand a test pressure of at least one and a half times its maximum designed pressure, and be tested and flushed before use. Notification to the water company applies to listed work, including some installations in houses.
Joists limit routes, because holes and notches can weaken them. Approved Document A points to TRADA span tables and structural standards, including BS 8103-3, for sizing timber floors. Have proposed holes or notches checked against the joist design, and ask building control or a structural engineer where it is unknown.
Staging
- Survey, drawing and agreed scope
- Incoming valve and temporary supply
- First fix routes while surfaces are open
- Pressure test before covering anything
- Connect fittings, flush and check for leaks
- Remove redundant pipe, label valves, record concealed routes
What it costs to replumb a house
One 2026 guide places a typical three-bedroom semi between £4,500 and £9,500. Answers from individual traders spread much further, because some include heating or a bathroom and others only water pipes. The figures here are third-party and are not a Proper Plumbing London quotation.
| Property, full replumb | Published range |
|---|---|
| 1 to 2 bedroom flat | £2,800 to £5,200 |
| 2 bedroom terrace | £3,500 to £6,800 |
| 3 bedroom semi | £4,500 to £9,500 |
| 4 bedroom detached | £7,500 to £14,000 |
| 5 bedroom detached, two bathrooms | £10,000 to £18,000 |
Source: BestBuilders, updated 16 August 2026, built from its own cost model and unnamed published sources. Its chart note says VAT is included and access variations are excluded. Answers to a MyJobQuote question about a three-bedroom house, posted March to May 2026, ran from £2,000 to more than £20,000. WaterSafe gives UK plumber day rates of £250 to £400. All checked 28 November 2026.
Hourly basis here
Replumbing has no fixed price. Weekday labour is £110 an hour with a one-hour minimum, and evenings and weekends are from £140 an hour. Booked jobs carry no call-out fee; an emergency visit is £110 an hour plus a £60 call-out on weekdays in the daytime, from £140 an hour plus £60 in the evening or at weekends. Materials are extra and agreed before work starts. No VAT is added, and the quote is free.
What changes the total
| Factor | Effect |
|---|---|
| Bathrooms, outlets and storage | More runs, valves and testing |
| Scope | Supplies only, or wastes and heating pipework as well |
| Floors and walls | Solid floors and finished rooms slow access |
| Material | Copper takes longer to joint than plastic |
| Occupancy | Temporary connections and staged visits add time |
| Surprises and other trades | Lead pipe, asbestos checks, electrics, joinery and making good |
Ask for a quote
Email the property type and age, number of bathrooms, photos of visible pipework, the problems you have and any renovation dates. Start with the contact form; pictures travel separately by email.
Related reading
Whole-house projects connect to signs that pipework needs replacing, staging the work while living there, first fix costs, surveying plumbing before a purchase, Victorian terraces, converted flats and ex-local authority flats. The wider set of guides on runs, joints and valves sits under pipework and valves.
At a glance
- Service
- Replumbing a house
- Area
- All of Greater London (service-area business, no showroom)
- Quote
- Free. Get the price in writing before work starts
- Phone
- 020 3961 8088
Questions
Can a house be replumbed while we live in it?
Often yes, if the work is staged with temporary connections, but expect periods without water and open floors. Agree those before work starts.