For a bathroom refit or a new layout anywhere in Greater London, Proper Plumbing London handles the supply and waste pipework. It is quoted free, and weekday plumbing time is £110 an hour, one hour at least.

Pipework for a bath, basin and WC is planned around drainage first and water supplies second. Waste pipes need fall and a route to the stack, which limits where fittings can go far more tightly than pressure pipes do.
Survey
- Soil stack position, material and the height of the existing branch
- Joist direction and depth, and what may be notched or drilled
- Water system type and measured pressure on hot and cold
- Valves that can isolate the room without shutting the whole property
- Space for access panels at traps, pumps and concealed valves
In a flat, shared stacks and freeholder consent can govern what is allowed. Moving a toilet is usually the hardest change because of the size and fall of its pipe.
Setting out
Each fitting's data sheet gives supply and waste positions measured from finished floor and wall, so tile thickness has to be known in advance. Mistakes here show up at second fix when pipes miss their connections.
Stages
| Phase | What happens | Proved before continuing |
|---|---|---|
| Strip out | Isolate, cap and remove old fittings | Capped ends hold |
| First fix | Run supplies and wastes, add supports and valves | Pressure and flow tests with pipes visible |
| Close up | Boarding, waterproofing, tiling by others or as agreed | Pipe positions recorded |
| Second fix | Fit sanitaryware, taps and shower | Operation and leaks |
Details that prevent trouble
Pipes in walls and floors must be placed and protected in line with Schedule 2 of the Water Fittings Regulations. Bidets with an ascending spray or flexible hose, and baths over 230 litres, are examples of work needing prior notice to the water supplier. Approved Document G covers sanitary conveniences, washing facilities and hot water safety. Extraction and electrics are separate trades with their own requirements.
Waste branches that join close together can draw each other's trap seals, so connection heights are planned as a set.
Photograph the first fix with a tape measure in shot. Anyone drilling for a mirror or screen later will be grateful.
Testing at handover
- Fill and drain basin and bath together and listen for gurgling
- Flush while the basin is draining
- Run the shower with another outlet open
- Check every accessible joint dry, hot and cold
- Operate each isolation valve and note its location
Faults that appear after a refit
A basin that gurgles when the bath empties suggests the shared branch is drawing air through a trap. Hot water that arrives slowly can follow a long new run or an oversized pipe. A damp ceiling weeks later points to a waste joint, a seal or a fixing driven into a pipe. Keeping the first fix photographs and the position of each access panel makes any of these far quicker to investigate, with less tiling disturbed.
Billing for this work
| Time | Rate |
|---|---|
| Weekday, 1 hour minimum | £110 per hour |
| Evening or weekend | from £140 per hour |
24/7 emergency visits: £110 an hour plus a £60 call-out on weekdays in the daytime, from £140 an hour plus £60 in the evening or at weekends. Booked jobs carry no call-out fee. Materials are extra and agreed first. VAT is not added. Quotation free. Rates verified 28 November 2026: billing detail.
What to send
A rough plan with measurements, photographs of the stack and cylinder or tank, the fittings you have chosen and whether walls will be opened. Send them using the contact form.
Related reading
Concealed pipework in a refit brings in pipes concealed in walls, pipes in concrete floors, pipes under floorboards, access behind lath and plaster, finding pipes before drilling and water rules for bidets.
Rules for a new layout appear in water efficiency limits for fittings and what you may do yourself. Lower-flow fittings can be priced as water-saving upgrades.
At a glance
- Service
- Bathroom plumbing
- Area
- All of Greater London (service-area business, no showroom)
- Quote
- Free. Get the price in writing before work starts
- Phone
- 020 3961 8088
Questions
When should pipework be tested during a refit?
Before floors, walls and boxing are closed, so a weeping joint can be reached, and again once the fittings are connected and run.
What decides where a new toilet can go?
Mainly the soil pipe, which needs size and fall. In a flat, shared stacks and freeholder consent can also govern what is allowed.
Does bathroom work ever need notice to the water supplier?
Certain items do, for instance baths above 230 litres and bidets fitted with a flexible hose or upward spray; the water company is told beforehand.




























